What is a yacht refit? An owner's guide
A yacht refit is a planned programme of work on a yacht that already exists. The owner decides what should change. That decision is written down. Yards and contractors are asked to price the same writing, and someone keeps the budget, the slot and the papers until the crew takes the yacht back. This guide describes that process in general. It is not a claim about a particular yacht, a price, or a result.
Yacht Refit Asia was founded in 2010 by Scott Taylor, who still owns it. The head office is in Singapore, at 336 Smith Street. Scott has run his own businesses since 1990. He started as a yacht painter in the UK in 1986. The company manages refits for owners. It is not a shipyard.
What a refit is, compared with repair and refurbishment
Owners use the three words as if they were the same job. They are not. A repair puts right something that has failed or been damaged: a leak, a cracked frame, a system that no longer runs. The aim is to return that part to service. The rest of the yacht is left as it was, unless the repair shows that more of it has to be opened.
A refurbishment refreshes what is already there. Soft furnishings, joinery finishes, deck coverings and tired equipment are renewed so the yacht looks and works as the owner wants, without rebuilding her. The structure, the systems and the underwater body may not be touched at all.
A refit is the wider programme. It can include repairs and refurbishment, and it can include work the owner has chosen even though nothing has failed: a new arrangement below, a change of finish, machinery taken out and replaced, or a survey list cleared before a season or a sale. The point of calling it a refit is that the work is planned as one programme, with one specification, rather than as a string of separate jobs added after the yacht is already in the yard.
Types of refit, from a minor refit to a full rebuild
A minor refit is a defined list. It might be coatings on one area, an interior refresh, or a set of defects from the captain's list. The yacht's arrangement stays. The programme is still written, still tendered, and still closed with papers, but the yacht is not taken apart beyond what that list needs.
A larger refit opens more of the yacht. Hull and deck coatings, machinery, electrical work, interior joinery and exterior decking can sit in the same specification. The trades have to be sequenced. Fairing, if it is in the scope, has to finish before the last colour. Interior work has to be protected from the dirt of the hull work, or scheduled around it. The owner is still looking at one yacht and one programme, not at a new vessel.
A full rebuild goes further. Structure, systems and arrangement can be replaced to the point where much of what returns to the water is new, on a hull that already existed. It is still a refit in the sense that it starts from a yacht, not from a bare mould, but the management load is of a different order. Access, staging, the order of the trades, and the papers for class and flag, where those apply, all grow with the scope.
The refit process
The sequence below is the one Yacht Refit Asia uses as a general process. Each step has its own note. Those notes describe the step. They do not set a form of contract, and they do not describe a particular yacht.
It starts with a condition survey and a written specification. Yards are asked to price that same document, so the comparison is like for like. The note on refit spec and tender sets out that step.
The owner then chooses the yard. Access, the slot, the skills the scope needs, and the yard's own rules all sit in that choice. Yacht Refit Asia coordinates the yard the owner selects. It does not publish a ranked list of yards. The note is yard selection.
Once a quote is accepted, the cost of the written scope is tracked from the tender through to redelivery. A change is written against the specification so the owner can see what moved. That is budget control. This site publishes no prices, no rates and no sample budgets.
Surveys, reports and the documents the yacht's appointed class society and flag ask for stay with the programme when the specification includes them. The society on a given yacht is the one appointed for that yacht. The note is Class and flag liaison.
Where the specification includes them, sea trials check completed work while the yacht is under way, before the owner takes her back. If trials are not in the specification, they are not assumed.
Every refit and repair programme managed by Yacht Refit Asia carries a written workmanship warranty. Where a coating system is applied to the manufacturer's specification, the manufacturer's product guarantee applies on its terms. The note is warranty work. This page does not state a period in months.
The programme closes with crew handover. The owner's crew receives the yacht, the close-out papers and an explanation of what was done. The papers are the ones the programme produced.
How long a refit takes
There is no standard length. It depends on the scope, the yard slot and what the survey finds. A minor refit with a defined list can be planned around a short slot. A rebuild cannot. The same yacht can need a longer programme if the survey, or the opening-up, shows more than the first specification described.
The slot itself is a limit. A yard that can take the yacht in the weeks the owner can release her is a different plan from a yard whose hardstand or dock is already full. Weather and cover matter for exterior work. Interior work can often continue when exterior work cannot, which is one reason the sequence is written before the yacht arrives.
This page does not offer a duration, in weeks or months, as a guide for any type of refit. A figure for a yacht is agreed on that yacht's specification and on the slot that is actually available. Anything else is a guess, and a guess is not a programme.
What a yacht refit costs
The cost follows the written scope. This page lists the drivers only. It publishes no prices, no rates, no sample budgets and no percentages.
The first driver is the work itself: how much of the yacht is opened, which trades are in the specification, and whether the programme is a minor refit or something closer to a rebuild. Hull and deck work, machinery, electrical work, interior joinery, decking and coatings do not cost the same kind of effort, and a specification that includes several of them is not the same job as a specification that includes one.
The yard slot and the docking are drivers of their own. Haul-out, hardstand, shed or tent, shore power, and the weeks the yacht occupies that space all sit in the yard's part of the quote. Two yards pricing the same specification can differ here even when the work list is identical.
Materials and the manufacturer's system, where a coating or another specified product is named, are drivers. So is labour: the skills the scope needs, and how much supervision the programme requires. Survey findings, and any change agreed after the yacht is opened, move the cost if they move the specification. Class and flag attendance, where the specification includes it, is another line, not a hidden extra.
The owner compares yards on one specification so those drivers are visible. A variation is a written change for something found after opening up, agreed before that work starts.
Refit project management
Someone has to hold the specification, the quotes, the slot and the papers. On a programme managed by Yacht Refit Asia, that person works for the owner, not for the yard. The yard is where the work is carried out. The project manager prepares the specification, runs the tender, and keeps the budget, the schedule and the coordination until handover.
That role is set out on yacht refit project management in Asia. It covers Singapore, Thailand and Vietnam, in that order. The same person can stay with the yacht if the programme moves between those countries. The owner is not asked to hold a separate thread in each place.
Management is not a substitute for the specification. It is how the specification is kept true while the yacht is open: progress in writing, photographs when the work is being recorded that way, and a variation agreed before extra work starts. At the end, the handover file is the specification, the reports, and the certificates and manuals the programme called for.
Choosing a refit company
The questions are practical. Who does the manager work for? Is there one specification that every yard prices? Who keeps the budget when something is found after opening up? Who holds the class and flag papers, if the yacht has them? Who is on site during the yard period, and who explains the finished work to the crew?
Those questions, and what to read before a yard is chosen, are on yacht refit companies. The page does not rank yards and it does not name other companies. It describes the owner's-side role and the places Yacht Refit Asia works.
A useful check is whether the company will say what it does not do. Yacht Refit Asia manages the refit. It does not claim to be a shipyard. Painting application, where the specification includes it, is carried out by the sister company, not described here as the manager's own trade.
Refitting in Asia
The countries, in order, are Singapore, Thailand and Vietnam. The head office is Yacht Refit Asia Pte Ltd in Singapore, at 336 Smith Street. A programme based there is described on superyacht refit in Singapore.
The Thailand branch is at Ocean Marina, Pattaya. It is an office, not a shipyard, and yachts are not lifted there. Berth-side and yard work in Thailand is managed from that branch. The page is yacht refit Thailand. Bangkok Dock is a facility in Thailand that can be used. No past project on this site is placed there. Phuket is a place of work inside Thailand, managed from the Pattaya branch, not a separate office.
Vietnam is current work, in Haiphong, carried out under the contract of the Thai company. It is not a future plan. The page is Yacht Refit Vietnam. One project manager can keep a Haiphong programme in the same report as work in Singapore or Thailand.
Paint within a refit
Coatings sit inside the written refit when the owner has asked for them. Surface preparation, fairing, primers, topcoats and antifouling are lines in the specification, sequenced with the rest of the work, not added after the yard has opened the job. The manager keeps that scope, the schedule and the inspection. The application is a separate trade.
Scott Taylor started as a yacht painter in the UK in 1986. The application on a Yacht Refit Asia programme is carried out by the sister company, Superyacht Painters, under the same founder and ownership. Readers who want the paint-system detail can read yacht painting on that site. The specification and the yard management stay with Yacht Refit Asia.
Questions
What is a yacht refit?
A yacht refit is a planned programme of work on a yacht that already exists. It is written down, priced against that writing, and managed through to the point where the crew takes the yacht back.
How is a refit different from a repair?
A repair puts right something that has failed or been damaged. A refit is the wider programme that repair may sit inside, together with whatever else the owner has asked to change. Refurbishment is the refreshing of what is already there, often inside, without rebuilding the yacht.
How long does a yacht refit take?
It depends on the scope, the yard slot and what the survey finds. A short list of defined jobs is not the same programme as a rebuild. No duration on this page is offered as a standard.
What does a yacht refit cost?
The cost follows the written scope. The drivers are the work itself, the yard slot and docking, the trades, the materials, survey findings, and any change agreed after the yacht is opened up. This page publishes no prices.
Who manages the refit for the owner?
Yacht Refit Asia manages the refit for the owner: the specification, the tender, the yard coordination, the budget and the delivery. The company was founded in 2010 by Scott Taylor and is headquartered in Singapore.
Where does Yacht Refit Asia carry out refit work?
The head office is in Singapore, at 336 Smith Street. The Thailand branch is at Ocean Marina, Pattaya. Bangkok Dock is a facility only, and no past project on this site is placed there. Current work in Vietnam is under way. The order of countries is Singapore, Thailand, Vietnam.
Discuss a programme
Send the yacht, the scope and the country. The reply comes from the Singapore head office and, for Thailand, from the branch at Ocean Marina, Pattaya.
Talk to our team